76707 ER Flood Management

Short Description
New homes in Flood zones
Reference number
ER76707
Date
Request

I am writing to make a request under the Freedom of Information Act 2000 to find out from the local authority how many homes it has allocated as part of its local plan to be built in medium and high-risk flood-zones?
The information relates to the council’s latest local plan. However, if the council’s local plan is out of date then please supply the number of homes that are currently allocated in its draft, examination or final adoption form clarifying this detail. 
A high-risk flood zone is designated by the Environment Agency (EA) as a flood zone 3 whilst a medium flood-risk zone is designated as a flood zone 2. However, the local planning authority should provide this information based on its own designation of flood zone 3a or 3b.
I would prefer to receive this information electronically, preferably as a data set in Excel and not as a PDF, to include the following information:
•    The name of the local plan e.g. Wirral's Local Plan 2020 to 2035
•    The number of homes allocated for flood zone 2 area e.g. 5,500 homes in a flood risk 2 area.
•    The number of homes allocated to be built in a flood zone 3a and 3b e.g. 3,000 homes in flood risk zone 3a and 500 homes in zone 3b
•    Details of any planned infrastructure flood defences that accompany the local plan e.g. a new hard wall to be installed along the river X, reducing X many homes from a high risk to medium risk.
If the information is not possible to put into a spreadsheet, please provide the information in its existing format, rather than rejecting this FOI request.              
 

Response