Standard 7: Design of drainage for construction, operation, maintenance, decommissioning and structural integrity
Construction / Structural integrity
Responsibilities for design safety and structural integrity of individual surface water drainage elements are set out in the Construction Design and Management (CDM) Regulations which is not within the LLFA’s remit to assess.
Maintenance and management Plan
At the planning application stage, future maintenance and access requirements must be considered and clearly set out in the drainage strategy.
For further information, please contact us:
Email
Address
Sustainable Drainage Systems (SuDS) Lead
Royal Borough of Windsor and Maidenhead
Town Hall
St Ives Road
Maidenhead
SL6 1RF
United Kingdom