Sustainable Drainage Systems Non-Major Design Guidance

Information with regards to drainage strategies and surface water management provisions associated with applications for non-major development.

Standard 3: Management of extreme rainfall and flooding

Infiltration

On sites where infiltration is proposed to drain surface water, the applicant should confirm the site infiltration rate and that there is 1m separation between the base level of the feature and the depth to the highest recorded ground water level.

Runoff rates

Surface water discharge rates should be limited to as close as possible to the greenfield rate for the designed storm event. The lowest achievable rate should be used where a sewerage undertaker states a maximum discharge rate in their developer enquiry response.

For brownfield sites the expectation is that the relaxation factor will only apply in exceptional circumstances.

For the majority of sites, where development is increasing the volume of runoff the allowable discharge rate will be limited to the 50% Annual Exceedance Probability (AEP) (1 in 2 year).

Exceedance events

An exceedance flow route plan demonstrating no increase in surface water flood risk on or off site should be submitted. The plan must include existing and proposed levels and flow directions.

For further information, please contact us:
Address

Sustainable Drainage Systems (SuDS) Lead
Royal Borough of Windsor and Maidenhead
Town Hall
St Ives Road
Maidenhead
SL6 1RF
United Kingdom