Under the Freedom of Information Act 2000, I am writing to request information relating to delays in electricity grid connections and network reinforcement affecting residential development in England over the last five financial years, from 1 April 2021 to 31 March 2026.
I would be grateful if you could provide the following information, broken down by financial year.
1. The number of residential developments awaiting a new electricity connection or an increase in existing connection capacity, where the connection is required to enable the construction or occupation of new homes.
2. The total number of proposed dwellings associated with these developments, where recorded, including a breakdown by development size (fewer than 10 homes, 10–49 homes, 50–99 homes and 100 or more homes).
3. The average and median time between a connection application being submitted and a connection being provided, including the number of applications that have been outstanding for more than 6 months, 12 months, 2 years and 5 years.
4. The number of residential developments awaiting connections where a connection date has been provided, broken down by the expected year of connection. Please also provide the number of developments for which no expected connection date has been confirmed.
5. The number of residential developments whose connections are dependent on wider electricity network reinforcement or upgrades, including the number of homes affected and the expected timescales for the required works.
6. A breakdown of the recorded reasons for connection delays, including:
o Insufficient local network capacity;
o The need for wider network reinforcement or upgrades;
o Delays to planned infrastructure investment;
o Shortages of equipment, materials or skilled labour;
o Delays in obtaining planning permission or other consents;
o Queueing or prioritisation of connection applications; and
o Other recorded reasons.
7. The number of residential developments that have been delayed, placed on hold or withdrawn because of electricity connection constraints, and the number of homes affected, where this information is held.
8. Where recorded, the average and median costs quoted to residential developers for new electricity connections and required network reinforcement, including any changes in these costs over the period requested.
9. Details of planned network reinforcement projects intended to increase capacity for housing development, including their expected completion dates and the estimated number of additional homes they are expected to enable, where recorded.
10. The current number of outstanding residential connection requests, the total number of homes associated with them and the length of time these requests have been awaiting connection.
Where possible, I would be grateful if the information could be provided in Excel or CSV format. If any of the requested information is not held in the format specified, please provide it in the closest available format.
FOI003925 FOI Sustainability and Climate
Short Description
Delays in electricity grid connections
Reference number
FOI003925
Date
19/11/2026
Request