In relation to the Holyport / Bray roundabout scheme at the A308 Windsor Road / Holyport Road junction (construction commenced January 2025), please provide:
1. The full set of approved detailed design drawings issued for construction (including general arrangement drawings, levels, cross-sections and kerbing details).
2. The detailed kerb and upstand specifications and construction details.
3. Any design revisions issued after the original approval, including revision schedules.
4. Any formal change control documents, site instructions or variation orders affecting kerb heights, edge definition, or layout.
5. The Stage 2 and Stage 3 Road Safety Audit reports and the designer’s responses.
6. The final “as-built” drawings (if available).