State visit
His Majesty Sultan Haitham bin Tarik, Sultan of Oman will visit Windsor, as guests of Their Majesties The King and Queen, with preparations beginning on Monday 19 October 2026. Find out more.
I hope you’re well. I am writing under the Freedom of Information Act 2000 to request the following information.
For the period from 1 July 2025 to the latest date for which records are held at the time of your search (please state the end date used), please provide:
1. Total recorded spend incurred by the Council for repainting roundabouts (including planned maintenance and reactive works), broken down where held by: staff time/recharge rates, contractor costs, vehicles/plant/materials, traffic management, disposal/waste, overtime.
1a. The number of jobs/incidents where roundabouts were repainted, with date and ward or postcode sector for each (no exact addresses required).
2. The job/incident category codes and cost centre/recharge codes used for these works (e.g. road markings/white lining/circulatory carriageway/roundabout).
3. The current schedule of rates (or equivalent) used by the Council and/or its contractor(s) for road-marking/white-lining works specifically applicable to roundabouts (e.g. per metre/per m² rates, mobilisation, traffic management).
4. Any policy/guidance/SOP in force during the period for inspection, prioritisation and repainting of roundabout markings and associated surfacing, including the legal basis (e.g. Highways Act 1980 s41 duty to maintain; Traffic Signs Regulations and General Directions 2016; Traffic Signs Manual – Chapter 5 (Road Markings); UKRLG “Well-managed Highway Infrastructure”).
If you do not hold a discrete “roundabout” category, please extract cases recorded under road markings/white lining/traffic signs & lines where the free-text notes contain “roundabout”, “RB”, “circulatory”, “island” or any likely similar keyword for the period.