Extreme weather
A red heat health alert has been issued for Wednesday 24 and Thursday 25 June. For more information on how to stay safe in hot weather, please visit the UKHSA website.
Under the Freedom of Information Act 2000, I am requesting information about the operation of the traffic signals at the following location:
Location: Rail Bridge on Welley Road , Wraysbury B376
Date and Time Period: Between 16:00 and 17:30 on 6 July 2025
Please provide:
• 1. A timestamped record/event log(controller/MOVA/SCOOT/UTC log) showing the actual operation of each signal phase during the above period. This should include each signal change event (e.g., red, amber, green) and its exact time.
• 2. The signal phasing and cycle sequence programmed to operate at this junction on that date.
• 3. Any fault, maintenance, or inspection reports for the signals within seven days before or after 6 July 2025.
• 4. Confirmation of whether the signals were operating under fixed-time, vehicle-actuated, or adaptive/UTC (SCOOT or MOVA) control at that time.
Please supply the information electronically (PDF, CSV, or text).