FOI002025 FOI Transport, Highways and Parking

Short Description
Local Electric Vehicle Infrastructure
Reference number
FOI002025
Date
13/08/2025
Request

1. The total LEVI (Local Electric Vehicle Infrastructure) funding allocated to your council and the amount spent to date.

2. The total number of EV chargepoints installed to date using LEVI funding (please provide type if available).

3. The total number of additional chargepoints currently planned or contracted for installation under this funding, and the expected delivery timeline.

4. Does the council have plans to run cross-pavement charging trials to help residents without driveways safely charge their electric vehicles?

Response