Maidenhead Town Moor

Blackamoor Lane

Multimap link showing location of Blackamoor Lane

Size: 62,556 sq m / 6.2 hectares.  A walk around the perimeter of this park will contribute 4,000 steps to the advised 10,000 daily steps recommended to improve fitness.

Open Space

Maidenhead Town Moor General View

No Facilities:

Site of travelling Fun Fair and Circus when visiting the Town.


Maidenhead Town Moor Improvements Consultation Results

As part of the proposal to improve Maidenhead Town Moor we asked for comments from local residents and users of the park. The children's play area at Cherwell Close was also included in the consultation as there be an opportunity to improve the play area as part of the overall scheme. This consultation closed on Friday 27 July 2007. We anticipate works commencing Autumn/Winter 07/08. We aim to retain the site for existing events such as Timbertown and other visiting attractions.

Here is a summary of the response received.

2500 were sent out of which 16.36% were returned.

How often do you visit Town Moor?

Daily 2/3 times a week  Once a week Once a mth  Once in 6 mths  Never 
23.35% 23.35%  19.51%  11.81%  11.54%  10.44% 

What activity do you undertake there? (Respondents could choose more than one answer)

Activity  No. of responses 
Cut through to town centre 218 
Informal exercise/games 114 
Visit fair/other events  94 
Relaxation/sitting  92 
Dog walking  69 
Use of allotments

These are the top three choices for improvements requested by residents.

Top three choices
Improvements to dry/wet channel
New tree plantng
Wildflower Meadow

Multi Use Play Area (MUPA) what is your preferred location 1,2 or 3?

32.65% of respondents preferred location 1 (opposite Cherwell Close wet/dry channel area)

These are the top three choices for sports in the MUPA

Top three choices
5-a-side Football
Basketball
Mini-Football

Would you like to see improvements to Cherwell Close play area?

Yes  24.45%  No  75.55% 

Landscape improvement plans are currently being drawn up for the Town Moor, with a view to implementing improvements on a phased basis starting in autumn/winter 2008.

Please note: Some responses could not be included in this survey analysis due to incorrect completion of the questionnaire.

Back to top

Validate: Valid XHTML 1.0 Strict
Modified: 2008-02-20
Author: Allison Helyer
LGSL PID:
RDCMS ID: 5991